Skip to main content

2007 BMW 3 series convertible video



The roof takes 25 seconds to go down and the same to go down. The party begins at 5:30, but the car sounds great on the road. I can't wait for more info.

I definitely need a loan!

Comments

Popular posts from this blog

Xmas Tree Subway Train Layout 2009

Here is the finalized version of the 2009 xmas tree layout using an MTH Premier R40 Subway set, Lionel Fastrack, MTH Graduated Trestle System, and MTH Realtrax Trestle Set. Here you can see how close the train is to the upper deck when it has to go under. Here is the upper deck view of the spiral. And here is the lower deck vantage point. This was the 1st version, but due to the incline of the spiral it's better to have the train go down on the steep grade.